Bathroom Remodeling
Done Right
Guest baths to full master suite overhauls. Tile showers, vanities, tubs, and flooring — all under one roof. Typical investment: $8,000 – $25,000.
Who is a bathroom remodel right for?
- Tri-Cities homeowners with a 1970s or 80s bathroom ready for a full update
- Aging-in-place homeowners considering tub-to-shower conversion for accessibility
- Homeowners with a fiberglass tub surround that's stained, cracked, or peeling
- Anyone planning to sell who wants to update bathrooms to modern buyer expectations
When a bathroom remodel isn't the right call
- ✕Homeowners with a strict $5K or under budget for a full bath
- ✕Vinyl insert tub/shower combo overlays (we don't do those)
- ✕Commercial bathroom buildouts
Tub-to-Shower Conversion vs Tub Retention — which path is right for your bathroom?
The single biggest decision in a bathroom remodel: keep the tub or convert to a walk-in shower. Cost, timeline, plumbing, and resale all hinge on it.
| Decision Point | Tub-to-Shower Conversion | Keep Existing Tub |
|---|---|---|
| Best for | Aging-in-place, families ready for modern walk-in showers | Resale homes (some buyers want a tub), kids' baths |
| Plumbing changes | Drain relocation + rough-in required | No relocation |
| Tile work | Full new shower walls + floor | Tub surround tile only |
| Glass enclosure | New shower door or panel | Shower curtain or none |
| Typical cost | $5,000 – $12,000 | $3,000 – $7,000 |
| Build time | 2–3 weeks | 1–2 weeks |
| Permits required | Yes (plumbing change) | Usually not |
| ROI on resale | Strong for age-in-place / luxury buyers | Better for families with young kids |
Not sure which one fits? We'll walk your bathroom, talk through aging-in-place plans, resale timing, and family needs, and tell you straight which path makes sense.
What's included in a bathroom remodel?
How does a bathroom remodel work, step by step?
Free On-Site Estimate
We come to you — usually within 1–2 days. No showroom pressure, no upsells. Just a real look at your space and an honest conversation about what you want.
Written All-Inclusive Quote
Within 48 hours you get a fully itemized quote. Every line is spelled out. The number we give you is the number you pay — no mystery add-ons mid-project.
Permits + Materials Ordered
We handle the permits and supply chain. You don't chase down paperwork or wait at the lumberyard. We schedule a start date and stick to it.
Build Day Through Final Walkthrough
Our crew shows up on the day we said we would. We don't leave until you've walked through the finished project and signed off on every detail.
How much does a bathroom remodel cost in the Tri-Cities?
How long does a bathroom remodel take?
Bathroom Remodel FAQs
How long does a bathroom remodel take?
Most bathroom remodels run 2–4 weeks from build day start to final walkthrough. Master baths and larger scopes can run 4–6 weeks.
Do I need to be out of the house?
No. We work in a contained area and you can use other bathrooms in the home. For one-bathroom homes, we'll plan the build schedule to minimize disruption.
Can you match existing tile if I just want a partial update?
We can try — but tile dye lots change. We're always upfront if we think a full replacement is the cleaner solution.
What's the difference between a remodel and a renovation?
Remodel = changing the layout or structure. Renovation = updating finishes in place. We handle both.
Do you handle walk-in shower conversions from a tub/shower combo?
Yes. Tub-to-shower conversions are one of our most common requests, especially for aging-in-place homeowners.
Ready to remodel your bathroom?
Get a free on-site estimate within 1–2 days. Written all-inclusive quote within 48 hours.